NORTH FLORIDA/North Florida Daycare Buildings

Child care building options

Describe the age groups, rooms and outdoor areas your center needs. Review the layout with the people responsible for operations, design and licensing.

01

Child care centers

A purpose-built center with classrooms grouped by age, a front office, a kitchen and restrooms sized for small children.

02

Infant and toddler rooms

Rooms planned around cribs, changing stations with hand sinks close by, and open sightlines so staff can see every child.

03

Covered play areas

Steel canopies over part of the outdoor play space, giving shade on hot days and a dry spot to play after a shower.

04

Center expansions

A new classroom wing on an existing center, or a second building on the same lot to raise licensed capacity.

05

Shell buildings for finish-out

The steel structure erected and closed in, ready for an interior contractor to build classrooms to the licensing plan.

06

Turnkey daycare buildings

Site work, slab, building, interior and mechanical systems delivered under one contract and ready for the inspections that come before opening.

REQUEST A QUOTE

Tell us what you need.

Tell us the age groups, room requirements and outdoor spaces you are planning.

3D BUILDING DESIGNER

Try the dimensions in 3D.

Change the size, doors and colors, then attach the design to your quote request.